Coop, Manchester

The Coop building in Manchester is an impressive 30.349 m2 construction featuring 4.000 workplaces for The Cooperative Group. The construction work commenced in 2010, and it was finished by March 2013. The building has won several awards for its architecture and its minimal energy consumption levels.

Sjølund has delivered 700 different anodized aluminum profiles. All profiles were marked individually in kit-sets and shipped directly to the construction site for mounting.